INITIAL CLEANING 3/19/08 |

LLRM front panel |

all set - a sunny day, a shop-vac, an air compressor, and the
modulator |

top is not too bad
5933's in center
monitor scope in lower left |

main mouse nest underneath |

after removing main nest |

some wire nibbles |

more nibbles |

still more nibbles |

wire nibble down in the hole - that'll be fun to repair! |

chassis stains |

speech amp stains |

scope HV area stains |
Document before starting disassembly |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
|
Prepare to Remove Sides and Rear |
 |
 |
 |
 |
 |
 |
 |
 |
Sides and Rear Removed |
 |
 |
 |
 |
 |
 |
 |
 |
Remove HV relay, resistor board, and chokes to clean rear
section |
 |
 |
 |
 |
Repair Nibbled Wires & Rusty Switches |
 |
 |
 |
|
 |
 |
 |
|
 |
 |
|
|
5/1/08 Reassembled and ready for testing |
 |
 |
 |
|