
a little dirty but looks OK - no mice! |

|

4/14/08 - onto the workbench for cleaning and checkout |
 |

filter cap area |

LV rectifier tubes |
 |
 |
 |
 |
 |
 |
 |

4/14/08 - power applied for the first time. Relays click & timer
motor runs - cool! |
However, I figured I might as well go ahead and strip this unit down to
clean it up. |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |

front section clean and ready for reassembly |
 |
Front section is mostly done - the rear is next. |

4/20/08 - choke connections - before disassembly |

rectifier tube area |
 |

power xfmr connections |

connector at rear |

4/21 disassembly for cleaning rear chassis area |
 |

I left power xfmr in place and cleaned around it |

cleaned chassis |

oops - I spent a lot of time reinstalling these in the wrong place!
need to shift left one mounting hole. |
 |

Resistors moved and rear chassis cleaned |

reinstall chokes |

reinstall sockets |
|
|
REASSEMBLED AND READY FOR OPERATION - 4/26/08 |
 |
 |
 |
 |
|
|
|
|